Oyabu Corporation (Fukuoka Prefecture)

An example of utilizing geothermal energy and groundwater heat, which are renewable energies.
We will introduce a case study of the introduction of water-cooled groundwater air conditioning to a construction company.

A construction company in Fukuoka Prefecture installed our groundwater conditioning air conditioner on their head office floor.
The air conditioning systems installed are three drip-type groundwater air conditioners AG-DCS-PR (stainless steel body).

We had three units on a floor of approximately 300 square meters.

Introducing area: Fukuoka Prefecture
Construction period: 1 month
Equipment installed: 3 drip-type groundwater air conditioners AG-DCS-PR (stainless steel body)

en_USEnglish